Creative Program

Theresa Harrison: Glimpses of Momentum

Franklin Street frames, August to September 2022

About the artwork

In June 2022, the Metro Tunnel Creative Program commissioned photographer Theresa Harrison to document the creation of a new work, Momentum by Women’s Circus. Momentum is a public, site-specific circus performance which invites the audience to take a journey, experiencing moments of connectedness, change and possibility.

About the artist

Theresa Harrison has been working, collaborating and collecting images within the Melbourne performing arts world for 15 years. Her work has a sense of playful drama while endeavouring to capture authenticity and connection.

About Momentum by Women’s Circus

Momentum is co-commissioned by Arts Centre Melbourne and the Metro Tunnel Creative Program as part of Alter State, a major disability arts festival celebrating contemporary art and live performance by artists from Australia and Aotearoa (New Zealand).

Learn more about Momentum by Women’s Circus.

Momentum performers

  • Tarn Scully
  • Anso Swann Biguet
  • Vivienne Halat
  • Dr Melinda Smith OAM
  • Creatrix Tiara
  • Emma J Hawkins
  • roya the destroya

Momentum crew

  • Co-directors: Jo Dunbar and Tarn Scully
  • Rigging Designer and Rigger: Franca Stadler
  • Project Manager: Alison Neville
  • Production Designer: Jac Antcliff
  • Sound Designer: Sharyn Brand
  • Production Stage Manager: Reis Low
  • Producer: Steph Cox (Women’s Circus General Manager)

Help us improve the website by completing a short survey

Close

Help us improve the website by completing a short survey

Close