Creative Program

Electric Confetti: A Very Metro Tunnel Xmas

City Square and Scott Alley, December 2020 to January 2021

About the artwork

To celebrate the festive season, Metro Tunnel Creative Program commissioned local studio Electric Confetti to create glittering, construction-themed decorations for our Town Hall Station site.

About the artist

Operating from a vibrant home studio in Sandringham, Electric Confetti was born from a love and fascination with typography and illustration – particularly vintage signage and packaging.

Creative director Natalie Jarvis was raised behind the counter of her father’s antique shop in New Zealand. This exposure to old-school packaging led to Natalie’s double major in art history and design at university and, after a time spent designing and illustrating, eventually to working with LED Neon.

Today, Electric Confetti is a bustling studio of seven devoted staff – including Natalie’s husband Scott, who brings expertise from his background in commercial construction, and Charlotte, one of the creatives behind the Metro Tunnel Creative Program Christmas designs for 2020.

Instagram: @electric_confetti
Website: electricconfetti.com

Photography by Anne-Marie De Boni

Give us feedback

Close

Give us feedback

Close