About the artwork
This design takes its inspiration from shapes and lines found around Melbourne. It might be the arc of Princes Bridge, the grid of the CBD, or the flow of the Yarra River, which together interact to create a colourful and seamless design. Among these shapes are various flowers, a reminder of our connection to the natural world amidst the urban jungle. The overall result is an abstract pattern that blends colour and shape, celebrating the bones of our city and the nature that surrounds it.
About the artist
Kate Pullen is a letterer and illustrator. While her work is varied, ranging from murals to editorial and digital illustration, it has a common theme reflecting her belief in the ability of the visual arts to inspire and lift spirits, to spark conversation and personal reflection. Through her practice,
Kate has worked to create pieces that support issues and causes she believes important, as well as shining a light on the beautiful aspects of the everyday that are sometimes overlooked.
Instagram @katepullendraws