What we're building
- A dual elevated carriageway with up to 3 lanes in each direction above Footscray Road.
- Ramps from the elevated road connecting directly into the port.
- A 2.5km veloway from Footscray to Docklands that will provide an off-road route that removes six intersections for cyclists, making trips safer and quicker. It will run from Shepherd Bridge to the city side of Moonee Ponds Creek.
