Repurposed level crossing removal materials donated to Werribee Open Range Zoo
Read more
We removed the Cherry Street, Werribee level crossing by building a road bridge over the rail line, connecting Tarneit Road and Princes Highway.
As part of the project the intersections at Wattle Avenue and Princes Highway, and Tarneit Road and Railway Avenue were upgraded and signalised.
A well-lit pedestrian and cyclist underpass near the old Cherry Street level crossing site also opened in March 2021, safely connecting pedestrians and cyclists to homes and local shops on both sides of the rail line.
The Cherry Street level crossing was removed in March 2021.