COMPLETED

Scoresby Road, Bayswater

The Scoresby Road, Bayswater level crossing was removed by lowering the Belgrave Line below Mountain Highway and Scoresby Road.

The new station precinct includes walking and cycling paths connecting Mountain Highway to Scoresby Road and linking in to the wider bike path network.

Public artwork has also been installed to enhance the newly created Mountain Highway underpass to Bayswater Station. The mural in the theme of 'Connecting to place, connecting people' was designed by Aboriginal artists, Graffix Creative, and students from Bayswater Secondary College.

Timeline

The level crossings at Scoresby Road and Mountain Highway in Bayswater were removed in 2016, and the new Bayswater Station opened in 2017.

Project video