COMPLETED

Seaford Road, Seaford

The Seaford Road, Seaford level crossing was removed using a hybrid design that lowered Seaford Road by 1.5m, and built the rail line onto a planted embankment.

Works continued through to 2019 on the $10 million revitalisation, which included 6km of new walking and cycling paths from Eel Race Road through Seaford and on to Frankston, a new community open space and playscape in RF Miles Reserve and the planting of more than 100,000 trees, shrubs and low-lying vegetation.

Timeline

The level-crossing-free Seaford Road opened to traffic in September 2018.

Project video