Creative Program

Fringe 2023: In Common

Federation Square, October 2023

About the event

The Metro Tunnel Creative Program partnered with Melbourne Fringe to present 3 performances of In Common outdoors at Fed Square, near the new Town Hall Station in Melbourne’s CBD as part of the 2023 Fringe Festival.

In Common saw Melbourne’s One Fell Swoop Circus thrill audiences with acrobatics on an impossible ‘tensegrity’ sculpture brought to life by the company’s signature style of acrobatics – heartfelt, powerful, and intimate.

About the performers

One Fell Swoop Circus creates work that combines a high level of circus skill with rich dramatic perspectives, specialising in traditional theatre shows and large-scale outdoor circus installation works. The company brings the dynamics of acrobatic ensemble work and the relationships within it to circus performance structures.

Give us feedback

Close

Give us feedback

Close