The level crossing at Furlong Road, St Albans was removed by lowering the rail line below the road.
The level crossing was removed at the same time as the crossing at Main Road, and new stations at Ginifer and St Albans were built as part of the project.
Ginifer Station has been moved up to the intersection at Furlong Road, with access to the station at Furlong Road and Bond Street.
Walking and cycling paths were also built, running parallel to the rail line.
The level crossings at Furlong Road and Main Road were removed and the new Ginifer and St Albans stations opened in 2016.