New Rosanna Station opens, with 2 level crossings gone for good
Read more
The level crossing at Lower Plenty Road in Rosanna was removed by building a rail bridge over the road. A new elevated Rosanna Station was built as part of the project.
This work was completed as part of a package of works that also removed the level crossing at Grange Road, Alphington and duplicated a single section of track between Heidelberg and Rosanna.
Before their removal, the boom gates at Lower Plenty Road were down for about 43 minutes during the weekday morning peak, causing delays for around 17,000 vehicles.
The level crossings at Lower Plenty Road and Grange Road were removed, and the new Rosanna Station opened in 2018.