Creative Program

Spencer Harrison: Excavation

2019

An artwork inspired by the act of digging, abstractly representing detritus and archaeological artefacts uncovered during the Metro Tunnel Construction, was installed at the Arden Station precinct on Laurens Street.

Melbourne artist Spencer Harrison’s abstract work depicted entities carving through the earth while simultaneously creating the future of Melbourne.

About the artist

Spencer Harrison is a visual artist who uses the language of abstraction to investigate the relationship between humans and the world around them, drawing on ideas from science, philosophy, play, mysticism and the natural world.

Photography by Anne-Marie De Boni