Creative Program

Alice Oehr: Summer Feasting

Swanston Street, November 2024 - current

About the Artwork

'I create my work using a combination of mediums, including collage, pastels and ink, and assembling them digitally. I love to cut shapes out of paper, and scan in hand-drawn textures to combine with digitally-drawn shapes. I also love to make patterns, which is why each of these summer feasts is on its own tablecloth, picnic rug or beach towel. Eating in summer to me is always outside – an icecream at dusk, summer fruits, and lots of Christmas seasonal treats.

Summer Feasting is a tapestry of summer culinary delights, to be enjoyed with family and friends when the weather is warm. From fish and chips at the beach to pizza in the park, Christmas pud at the table, or an icecream on a warm summer evening – it's a delicious time of year. Enjoy it!'

About the Artist

Alice Oehr draws for business and for pleasure. She is interested in design that walks the line of good taste. Her distinct, colourful style incorporates a love of food, pattern, collage and drawing. Alice’s commercial work is sought-after by local and international clients and has appeared in numerous books as well as on textiles, homewares and large-scale installations