Creative Program

Angharad Neal-Williams: Connecting Spaces

Scott Alley, February 2025 - current

About the Artwork

"Stopping for lunch, walking with shopping bags, parking a bike and working from a café are scenes that are familiar to Scott Alley and the surrounding laneways.

This playful, quirky illustration explores the idea of a bustling city and the people that fill the streets with movement and buzz. Imperfections in the line work bring the artwork to life, contributing to the juxtaposition of rush, wonder and contemplation and the ways in which we share public spaces, each taking up space in different ways.

At times, the crowded city streets can feel overwhelming, reflected in the scale and lack of focal point in the artwork, creating a pattern of people, rhythm and flow."

About the Artist

Angharad Neal-Williams is an illustrator in Naarm/Melbourne, drawing scenes, moments, objects and ideas for a range of creative outcomes. Her work spans public art, graphic recording, branding and illustrations for print and digital mediums.

The subject matter she explores is often playful, inspired by the everyday, and has an optimistic feel. She works with limited colour palettes and line drawing in both digital and traditional mediums to create her distinctive style

Give us feedback

Close

Give us feedback

Close