Creative duo Will and Garrett Huxley designed an engaging artwork to share an important safety message during the COVID-19 pandemic. The sparkly, life-sized koalas were joined by love – but at a safe physical distance of 1.5m. The artwork brightened up the Scott Alley laneway during a challenging time in the central city.