Creative Program

Alice Lindstrom: Botanica Apartment Pedestrian Gantries

St Kilda Road, March 2019 to August 2019

In February 2019, Melbourne based illustrator Alice Lindstrom was commissioned to create 2 concept designs to be installed in the pedestrian gantries outside 400 St Kilda Road. Residents of the Botanica Apartments selected their preferred design which was installed in March 2019.

Artist statement

"Using the aesthetic of the Botanica Apartments and the character of the location as my starting point, I created an image that provides a sense of fluidity and movement to residents and passers-by. The imagery references the interior architecture of the Botanica Apartments, the Melbourne Botanic Gardens and St Kilda beach. I used an illustrative, mid-century style to allude to the surrounding landscape and native flora as well as depicting stylised snapshots of urban life."

About the artist

Alice Lindstrom is a Melbourne based illustrator who works primarily in collage, using cut and paste techniques to create layered illustrations. Previous clients include Penguin Random House New York, Harper Collins, Soho House London, The Victorian Women’s Trust, T2 and ABC Radio National.

Help us improve the website by completing a short survey

Close

Help us improve the website by completing a short survey

Close