A public, site-specific circus performance, 'Momentum' invites the audience to take a journey, experiencing moments of connectedness, change and possibility.
A series of photos by Theresa Harrison documenting the creation of Momentum, was presented in the Franklin Street frames in 2022.
Momentum is co-commissioned by Arts Centre Melbourne and the Metro Tunnel Creative Program as part of Alter State, a major disability arts festival celebrating contemporary art and live performance by artists from Australia and Aotearoa (NZ).
Learn more about Momentum by Women’s Circus.

Photo by Sarah Walker
Momentum performers
- Tarn Scully
- Anso Swann Biguet
- Vivienne Halat
- Dr Melinda Smith OAM
- Creatrix Tiara
- Emma J Hawkins
- Roya the destroya
Momentum crew
- Co-directors: Jo Dunbar and Tarn Scully
- Rigging Designer and Rigger: Franca Stadler
- Project Manager: Alison Neville
- Production Designer: Jac Antcliff
- Sound Designer: Sharyn Brand
- Production Stage Manager: Reis Low
- Producer: Steph Cox (Women’s Circus General Manager)
Instagram: @womenscircus