Mini Melbourne is a world-first resource designed as part of the Metro Tunnel Education Program.
In partnership with the Victorian Department of Education, we created 600,000m2 of Melbourne’s city centre in Minecraft.
Any Minecraft user can download the Bedrock and Java versions of Mini Melbourne for free and start exploring.
The Minecraft: Education Edition (Minecraft: EE) versions of Mini Melbourne host a range of learning activities that teachers can share with their students.
Download the latest Mini Melbourne map (ZIP file)
How to install Mini Melbourne
How do I know which version of Minecraft I have?
Classroom activities
These Metro Tunnel based learning activities are available in the Minecraft: Education Edition versions of Mini Melbourne.